April 19, 2008

46
35 (Jenny Vaughn picture) Tennessee backs the GP9 into the roundhouse 4-19-08
47
36 (Jenny Vaughn picture) Tennesse working on an signal wiring box 4-19-08
48
37 (Jenny Vaughn picture) Tennesee with the finished signal 4-19-08
49
38 (Jenny Vaughn picture) Alex Vaughn - Young engineer in training 4-19-08
50
4 (Jenny Vaughn picture) Tennessee and Alex Vaughn working on crossing signal 4-19-08
51
4 - #17 departs the yard with the work train 4-19-08
52
5 (Jenny Vaughn picture) Tennessee and Alex Vaughn 4-19-08
53
5 - The new work caboose 4-19-08
54
6 (Jenny Vaughn picture) Zach Gillihan and Alex Beams 4-19-08
55
6 - Steve and Alex working on yard crossing gate project 4-19-08
56
7 (Jenny Vaughn picture) John and several guests prepare to take a ride in the work caboose 4-19-08
57
7 - Yard crossing gate cabinet and wiring 4-19-08
58
8 - Alex, Zach, and Steve working on yard crossing gate project 4-19-08
59
9 (Jenny Vaughn picture) Young engineer in training 4-19-08
60
9 - Don (Tennessee) working on crossing signal 4-19-08
arborwayrailroad.com